Alpine Equipment Manuals

AutoMill HP Product Manual

Issue link: http://alpine.uberflip.com/i/577795

Contents of this Issue

Navigation

Page 30 of 167

31 AutoMill HP ™ P R O D U C T M A N U A L EN Jog Up Drop down box Jog until 8.00 Figure 50 Step 12. Arrange 2x4 boards lying flat in all of the material conveyor dogs (Figure 51). 2x4 Lumber Lying Flat Hold-Down Springs Figure 51 Step 13. Using the drop down box select Left Up/ Dn Step 14. Lower the Left Hold-down until the springs are compressed 1/8 inches across the entire length. Step 15. Click Calibrate to set the Left Hold-down position Step 16. Repeat Step 13 and 14 for the Right Hold- down. Step 17. Remove the boards from the material conveyor. 4.4.6. Hold-down Calibration Step 1. Check that the Hold-downs are level (Section 5.4). ! CAUTION If it is determined that the Hold-downs are not level follow the procedure in Section 5.4. Contact Alpine Technical Support with any questions. If the Hold-down is level proceed with the following steps to complete the calibration process. Step 2. Turn the Key Switch to SETUP (Section 2.3). Step 3. Select SEMI on the Main Menu. Step 4. On the Board Select Menu setup a cut as shown in Figure 49. Figure 49 • Set Angle 1 and 2 to 90 • Set Height 1 to 0-3-8 • Set OA Len to 4-0-0 NOTE The remaining length values will calculate automatically. Step 5. Click SETUP on the Board Select Menu. Step 6. Click SETUP on the Run Menu. Step 7. Click Calibration on the Main Menu Toolbar. Step 8. Click Left HD Up/Dn. Step 9. Raise the Left Hold-down 8 inches using the jog function (Figure 50). Step 10. Using the drop down box, Select Right HD Up/Dn (Figure 50) Step 11. Raise the Right Hold-down 8 inches using the jog function (Figure 50).

Articles in this issue

view archives of Alpine Equipment Manuals - AutoMill HP Product Manual