Either method produces the resultant loads shown below. Step 2 Next we are going to extend the existing floor load confined to the room area to the right heel of the girder. In our example the floor extends to only the right end of the truss. Other dormer conditions may require the floor to be extended to both ends. The following steps should be adjusted to meet the specifics of your condition. The Attic Std. Ld. Load case should be visible in the Current field before proceeding. 1. Select the Display LL and DL icon from the Loading Toolbar. The Live and Dead Loads are combined allowing them to be modified at the same time. 2. Select the Modify Uniform Loads icon from the Loading Toolbar. 3. Select the Uniform Floor Load on the Loading Diagram to access the Uniform Loads dialog box. The selected load changes color for visual verification. 4. Select the Apply and Change Location button. 5. The highlighted prompt at the bottom of the screen indicates that intelliVIEW is waiting for a new start location for the selected Uniform Load (Uniform load start location?) Press the key to use the original start point. 6. The highlighted prompt at the bottom of the screen changes (Uniform load end location?). Using the mouse select a point at the right end of the truss (i.e. the right edge of the right heel).

Articles in this issue

view archives of Alpine Training - Introduction to Truss Loading Course Workbook