Alpine Training

Introduction to Truss Loading Course Workbook

Issue link: http://alpine.uberflip.com/i/684939

Contents of this Issue

Navigation

Page 27 of 75

4. By default, intelliVIEW populate the data fields, based on the truss being loaded. It recommended that you verify that these entries are correct before proceeding. 5. Select the Apply button to load the truss and then select the Done button to close the dialog window. 6. The image (right) displays the resultant loads. From iModel When the cantilevered hip jack is created in layout, the loads can be generated automatically using the Structural Fascia option. The structural fascia, shown right, supports the corner jack CJ1, CJ3, and CJ5. The fascia is supported by the Hip Jack HJ10, the end jack CJ7, and the #1 hip girder truss.

Articles in this issue

view archives of Alpine Training - Introduction to Truss Loading Course Workbook